Challenge
A construction project in Bremen required an industrial architect and engineer to perform a feasibility study for an intralogistics facility expansion. The study needed to cover architectural feasibility, TGA assessment, structural requirements, and fire protection standards.
Solution
expertpowerhouse provided two experts in industrial architecture and TGA, who conducted a comprehensive feasibility analysis. The team verified compliance with building regulations, assessed infrastructure needs, and developed a fire protection strategy, ensuring the project met all required standards.
Result
The feasibility study provided the client with a clear understanding of the project's viability, including architectural adjustments, TGA requirements, and structural and fire protection considerations, supporting informed decision-making for the intralogistics expansion.